Formwork Tie Rods & Temporary Works Hardware
CHS can review RFQs for formwork tie rods / template pull rods and related engineering accessories. Product naming varies between supplier catalogs and project documents, so final identity and compatibility should be confirmed from buyer drawings, BOMs or project specifications rather than from a product name alone.
Buyer-Side Scope
Current structured source evidence supports this product family as a sourcing category, but detailed engineering claims remain evidence-gated.
What to Send in an RFQ
For temporary-works hardware, drawings and project references are especially useful when catalog terminology is inconsistent.
- Drawing, BOM or project specification
- Rod / tie system name used by the project
- Diameter, length and thread details
- Required mating nuts, connectors, plates or other accessories
- Required material, grade or finish
- Quantity by item
- Packing and identification requirements
- Required inspection, test or documentation items
Prices, MOQ, packing, documentation and lead time are confirmed after manual RFQ review.
Important Evidence Boundary
No structural performance value is inferred from catalog appearance.
Load capacity, allowable use, mechanical properties, certifications and project compliance must be supported by the buyer's specified standard, approved supplier documentation or other project evidence. CHS does not convert unverified supplier marketing claims into verified engineering statements.
Prepare the RFQ
Use the formwork tie-rod buyer checklist before quotation review.
